“Acceptance Publicity” Zhongshan Myrra Electronics Co

“Acceptance publicity” Zhongshan MYRRA Electronics Co., Ltd. change, reform and expansion project completion and commissioning time publicity In accordance with the Interim Measures for the Acceptance of environmental conditions for the completion of construction projects, publicity is made public on the completion of the change, modification and expansion projects of Zhongshan MYRRA Electronics Co., Ltd., so that the construction of the project may affect the public’s understanding of the construction of the project in the regional environment, and through publicity to understand the public’s attitude and suggestions to the project,To accept the supervision of the public.

First, the location, content and scale of the project construction The original Zhongshan MYRRA Electronics Co. , Ltd. was built in Zhongshan City, Guangdong Province, Xiaolan Town, Xiaolan Industrial Zone Industrial Avenue 39, 21-3 floors, mainly engaged in processing, sales: electronic transformers and so on. The investment of the project before the change and expansion of 2.1 million yuan, of which 50,000 yuan, the land area of 4000 square meters, the construction area of 5230 square meters. Now change, change the project before the lease of the project next to the industrial plant 1 and 3 floors for production activities. After the change, expansion of the project total investment of 4 million yuan, of which 430,000 yuan investment in environmental protection.

After the change, expansion of the project land area of 4000m2, building area of 8747m2.

Pollutants from project production and treatment programmes Zhongshan MYRRA Electronics Co. , Ltd. to produce pollutants in the process of

(1) welding, thermal printing, tin-soaked processes: unified collection after the organized emissions.

 (2) The exhaust gas of the immersion and drying process is treated by UV photolysis and activated carbon.

 (3) printing, drying, dispensing, drying process exhaust gas by UV photosolutions and activated carbon treatment.

Third, the completion of the commissioning date

Completion date: Commissioning will begin in May 2018 and will be completed in July 2018.

 

Publicity period: 7 working days.

The scope of public consultation

Pay attention to the construction of the project and the surrounding environmental impact area residents, units and other public.

Public feedback methods

 The public shall send letters, e-mails and other means to the designated address of public ity, express opinions and opinions on the completion of the project, and provide contact details at the same time, and the construction unit will listen to public opinions to rectify the construction project.

Six, the name of the construction unit and contact information

Construction unit: Zhongshan MYRRA Electronics Co., Ltd.

Company address: Zhongshan City, Xiaolan Town, Xiaolan Industrial Zone, 39, 21-3 floors

Contact: Minyi Leung

Phone: 15800137655

[验收公示] 中山美尔亚电子有限公司变更、改扩建项目竣工调试时间公示

根据《建设项目竣工环境验收暂行办法》等有关规定,对中山美尔亚电子有限公司变更、改扩建项目的竣工情况进行公示,使项目建设可能影响区域环境内的公众对项目建设情况有所了解,并通过公示了解社会公众对本项目的态度和建议,接受社会公众的监督。

一、项目建设地点、内容及规模

原中山美尔亚电子有限公司建设于广东省中山市小榄镇小榄工业区工业大道39号之二1-3层内,主要从事加工、销售:电子变压器等。变更、改扩建前项目投资210万元,其中环保投资5万元,用地面积为4000平方米,建筑面积为5230平方米。现变更、改扩建项目租用前项目旁工业厂房1层和3层进行生产活动。变更、改扩建后项目总投资400万元,其中环保投资43万元。变更、改扩建后项目用地面积4000m2,建筑面积8747m2。

二、项目生产产生的污染物及治理方案

中山美尔亚电子有限公司产生污染物的工序为①氩焊、热印、浸锡工序:统一收集后有组织排放。②浸漆和烘干工序废气经UV光解+活性炭治理。③印字、烘干、灌胶、晾干工序废气经UV光解+活性炭治理。

三、竣工调试日期

竣工日期:该工程于2018年5月开始调试,2018年7月调试完成。

公示期限:7个工作日。

四、征求公众意见的范围

关注本项目建设项目和周边环境影响区域内居民、单位等公众。

五、公众反馈方式

公众采取向公示指定地址发送信函、电子邮件等方式,发表对该工程竣工的意见和看法,发表意见的同时请提供详细的联系方式,建设单位将听取公众意见对建设项目进行整改。

六、建设单位名称及联系方式
建设单位:中山美尔亚电子有限公司

公司地址:中山市小榄镇小榄工业区工业大道39号之二1-3层内

联系人:梁敏仪

电话:15800137655

Privacy Preference Center

Necessary

gdpr[allowed_cookies],gdpr[consent_types],wfvt_3770857608,wordfence_verifiedHuman,WLM_TEST_COOKIE,PHPSESSID